Description
The simulation starts at 6 am and runs to 10 pm, set in the year between introduction of the Hastings diesels and the start of the Kent Coast electrification. Almost all main line services are steam-hauled, and they include many boat trains at higher difficulty levels. Freights serve the three yards and several other sidings, as well as the locomotive and wagon works. Some freight shunting is included. Bonus points are available for allocation of locos of the rostered type or from the correct depot, and for correct placement of incoming freight.
Reviews
There are no reviews yet.