Somerset & Dorset Line 1957

£20.00

A line control simulation covering this busy line between Bath and Poole, with a mixture of passenger and freight services; both weekday and Saturday schedules are provided.

Category: Tags: , , ,

Description

A line control simulation covering this busy line between Bath and Poole, with a mixture of passenger and freight services; both weekday and Saturday schedules are provided. The Highbridge branch is included, and this and parts of the main line are single track. This simulation gives you a chance to see how hard this line was to operate to schedule, particularly on a summer Saturday. Some trains shunt off the main line, or terminate, at various points along the line. No details of motive power are given, as this is control at a broader level. There are two track screens. Our testers say this is harder than it looks!

Additional information

Platform

DOS

Reviews

There are no reviews yet.

Be the first to review “Somerset & Dorset Line 1957”

Your email address will not be published. Required fields are marked *