Norwich 1982

£20.00

Before electrification, manage this busy terminus on a summer Saturday. Through trains to and from Yarmouth all need a change of engine, and these and the terminating London trains compete for limited platform space with local services on the coast lines and from the Ely direction, as well as through holiday trains from the Midlands to Yarmouth.

Description

Before electrification, manage this busy terminus on a summer Saturday. Through trains to and from Yarmouth all need a change of engine, and these and the terminating London trains compete for limited platform space with local services on the coast lines and from the Ely direction, as well as through holiday trains from the Midlands to Yarmouth.

Additional information

Platform

DOS

Reviews

There are no reviews yet.

Be the first to review “Norwich 1982”

Your email address will not be published. Required fields are marked *